Data Center Instrumentation for Liquid Cooling and Chilled Water

Reotemp builds the pressure and temperature instruments that keep data center cooling running: gauges, thermometers, thermowells, snubbers, test plugs and valves for CDUs, chiller plants, pumps, cooling towers and heat exchangers. Tape-free BSPP (G-thread) and all-stainless options are available for liquid cooling loops.
Send Us Your Part NumberSee Data Center Products
Built in the USA
Gauges, thermometers, thermowells and valves built to order in San Diego and Houston.
10-Year Warranty
The PT45A Texas Edition process gauge carries an industry-leading 10-year warranty.
Dozens of Process Connections
NPT, BSPP (G), flanged, tube fittings and more, so the instrument fits the spec without adapters.
Days, Not Months
We build our own instruments, so hundreds or thousands ship in days, not months.
Trusted on AI and Hyperscale Builds
Reotemp gauges, thermometers, thermowells, valves and RTDs are installed on the cooling systems of hyperscalers, AI labs and neocloud operators across nine states.
End users include three technology companies each valued at more than $1 trillion.
AI supercomputer campus, Mid-South
1,000 of Everything, Delivered in About Two Weeks
An AI supercomputer campus needed 1,000 pressure gauges, 1,000 bimetal thermometers, 1,000 thermowells and 1,000 snubbers on a construction schedule measured in days, not months. Reotemp built and delivered the full scope in about two weeks.
Instead of holding the order to ship complete, production released 100 or more finished instruments a day so install crews never waited on parts. Every piece came off Reotemp production lines: thermowells machined in-house, snubbers assembled in Houston, and gauges built liquid-filled with customer-logo dials. Follow-on orders of several hundred gauges and thermometers have turned in under a week.
Hyperscale campuses, Pacific Northwest
An RTD Program That Stuck Through Every Phase
Explosion-proof 316SS RTD head assemblies with HART transmitters, paired with stepped thermowells, on chilled water skids. Reotemp replaced the originally specified brand and has been retained through every build phase, including a change of mechanical contractor.
RTD head assemblies →Hyperscale cloud campus, Upper Midwest
All-Stainless Thermometers to Stop Galvanic Corrosion
Engineering flagged galvanic corrosion between aluminum thermometer stems, brass fittings and stainless wells. Reotemp supplied industrial glass thermometers with stainless stems and swivel nuts in stainless thermowells, and the spec has carried into later phases.
Industrial glass thermometers →AI factory, Northern Nevada
5-Valve Manifolds at AI Factory Scale
A Bay Area mechanical contractor building an AI factory in Northern Nevada buys Reotemp 5-valve manifolds in volume to isolate, equalize and vent its differential pressure instruments.
5-valve manifolds →Tape-Free Connections for Liquid Cooling Loops
Liquid cooling loops run through cold plates and CDU strainers fine enough that a shred of PTFE tape or a bead of thread sealant becomes a contamination problem. A growing number of data center specs ban both and call for connections that seal without them: BSPP (G-thread), socket weld or flanged.

NPT (tapered)
Seals on the threads, so it needs tape or sealant. Fragments can break loose into the coolant.
BSPP / G (parallel)
Seals at a face washer or O-ring. The threads only hold, so there is nothing to shred.
Built to Your Site's Thread Spec
Anything we build in NPT, we can build in BSPP (G-thread) or any other thread your site specification calls for: gauges, thermometers, thermowells, snubbers, valves, manifolds and test plugs.
Preventing Galvanic Corrosion at the Thermometer Well
Put aluminum, brass and stainless steel together in a wet loop and you have built a battery. The less noble metal corrodes, starting at the threads. Most industrial glass thermometers ship with an aluminum stem and a brass swivel nut, then go into a stainless well. Reotemp builds its 7″ and 9″ industrial glass thermometers with a stainless steel stem and swivel nut, so stem, nut and thermowell are one metal. Running copper and brass instead? We will build the whole path in brass.

Typical: three metals in contact
Aluminum stem, brass swivel nut, stainless thermowell. The aluminum and brass corrode where they meet the stainless.
Reotemp 7V and 9V: one metal end to end
Stainless stem, stainless swivel nut, stainless thermowell. Nothing to corrode against. All-brass available for copper systems.
Pressure Gauges and Accessories
Nearly every gauge we ship to data centers goes out liquid filled with a snubber and an isolation valve.

PT45A Texas Edition Process Gauge
| Series | PT45A |
| Dial Size | 4.5″ |
| Accuracy | +/- 0.5% or +/- 1% |
| Ranges | Vacuum, Compound, 10psi thru 30,000psi |
| Material | Tube & Socket: 316SS or Monel A400 or Brass |

PT45T Stainless Case Process Gauge
| Series | PT45T |
| Dial Size | 4.5″ |
| Accuracy | +/- 0.5% or +/- 1% |
| Ranges | Vacuum, Compound, 10psi thru 20,000psi |
| Material | Tube & Socket: 316SS |

Industrial Stainless Steel Gauges (PM40)
| Series | PM40 |
| Dial Size | 4″ |
| Accuracy | +/- 1% Full Scale |
| Ranges | Vacuum, Compound, 15psi thru 10,000psi |
| Material | Tube & Socket: 316SS Case: 304SS, laser welded to socket |

Repairable Industrial Stainless/Brass Gauges
| Series | PG**S |
| Dial Size | 2.5″ & 4″ |
| Accuracy | 2-1-2% (2.5″), 1% (4″) |
| Ranges | Vacuum, Compound, 10psi thru 10,000psi |
| Material | Tube & Socket: Brass Case: 304SS, twist-off bezel |

Snubbers
Snubbers dampen pump pulsation and pressure spikes to protect gauges and transmitters. Porous disk and piston styles are available.

G22 2-Valve Block & Bleed
The G22 2-valve block and bleed lets you isolate, vent and remove an instrument without shutting down the system. The 1/4" NPT bleed port makes calibration checks easy.

M52 5-Valve Manifold
The M52 5-valve manifold protects differential pressure instruments and lets you isolate, equalize and vent them for maintenance, testing and replacement.

N12 Needle Valve
The N12 needle valve isolates gauges, transmitters and switches so you can install or remove them without a shutdown. Connections range from 1/4" to 1.5" NPT.

2-Valve Manifold
A 2-valve manifold pairs an isolation valve with a vent valve, or two isolation valves in a single block for DP service. Block and flanged connections are available.

Test Plugs
Test plugs let you take pressure or temperature readings without shutting down the line. You can choose brass, lead-free brass or stainless steel bodies with Nordel or neoprene cores.

PXG Gauge Cock
The PXG gauge cock is a brass shutoff valve with a lever handle that isolates an instrument from the process. Single nut and high pressure double nut styles are available.
Thermometers, RTDs and Thermowells
RTD head assemblies carry the signal to the BMS. Thermometers give a local reading that works with the power off. Thermowells let you pull either one without draining the loop.

Adjustable Angle Bimetal Thermometer
| Series | LL, MM, JJ |
| Dial Size | 3″, 4″, 5″ |
| Accuracy | +/- 1% Full Scale |
| Ranges | -100 to 1,000°F |

Industrial Glass Thermometer
| Series | 7V, 9V |
| Dial Size | 7″, 9″ |
| Accuracy | +/- 1% Full Scale |
| Ranges | -40 to 300°F |

Head Assembly
A thermocouple or RTD head assembly comes with or without a HART or 4-20 mA transmitter. You can choose explosion proof, corrosion resistant or LED display heads.

Universal In-Head Transmitter (TCX-5331A)
| Mounting Style | In-Head |
| Input | RTD, TC, Ω, or mV input |
| Output | 4-20 mA |
| Approvals | ATEX (Zone 2), IEC, IECEx, INMETRO, DNV-GL, EAC, CE, GOST |

Threaded
| Style | Threaded Thermowells |
| Replacement | Infrequent |
| Typical Process | Smaller Pipes or Vessels, Non-corrosive Media |

Weld-In
| Style | Weld-In Thermowells |
| Replacement | Rarely |
| Typical Process | Non-corrosive, High Temperature or Pressure |
Which Instrument Where
Scroll sideways to see all columns →
| System | Measuring point | Instrument | Reotemp products |
|---|---|---|---|
| CDU / technology cooling loop | Supply and return pressure | Liquid-filled gauge with snubber and isolation valve, or 4-20 mA transmitter | PT45A or PT45T, NPT or BSPP; snubbers; G22 block and bleed; TA or TDS |
| CDU / technology cooling loop | Supply and return temperature | RTD with in-head transmitter in a thermowell | RTD head assembly with in-head transmitter; threaded or weld-in thermowell |
| Chilled water plant | Chiller, pump and heat exchanger connections | Liquid-filled gauge with snubber and gauge cock or valve | PT45A, PM40 or PG**S; snubbers; PXG gauge cock or G22 |
| Chilled water plant | Supply and return lines | Thermometer in a matching-metal thermowell | 7V or 9V industrial glass with stainless stem; adjustable angle bimetal; thermowells |
| Chilled water plant | Temperature signal to the BMS | RTD head assembly with transmitter | RTD head assembly with TCX-5331A or Model W HART |
| Condenser water and cooling towers | Tower supply, return and basin | Thermometer, gauge, level transmitter | Bimetal; PG**S; TL submersible level |
| Filters and strainers | Pressure drop across the element | Differential pressure gauge with manifold | D21 or D31 for liquid, DMG for air; M52 5-valve manifold |
| Any water line | Commissioning and service readings | P/T test plug | Stainless or brass test plugs |
Data Center Instrumentation FAQ
Why do liquid cooling specs ban PTFE tape and thread sealant?
Cold plates and CDU strainers have passages small enough that a shred of tape or a bead of cured sealant can restrict flow or foul a filter. Specs increasingly require connections that seal without either: BSPP (G) parallel threads with a face washer or O-ring, socket weld, or flanged ends. Reotemp builds gauges, thermowells, test plugs and fittings in those connections.
How do I prevent galvanic corrosion at thermometer connections?
When dissimilar metals such as aluminum, brass and stainless touch in a wet loop, they form a galvanic cell and the less noble metal corrodes. Keep the wetted path in one metal: a stainless stem, swivel nut and thermowell, or all brass in a copper and brass system. Reotemp builds its industrial glass thermometers both ways.
Why are most data center gauges liquid filled?
Fill damps pointer flutter from pump pulsation and vibration, protects the movement, and keeps condensation from fogging the dial in humid plant rooms. Nearly every gauge we ship to data centers is liquid filled.
Do I need a snubber?
On pump discharge and anywhere pressure pulses, yes. A snubber restricts surges before they reach the gauge or transmitter. We ship one with most data center gauges.
What is a P/T test plug?
A self-sealing port, often called a Pete's plug, that lets a technician insert a test gauge or thermometer probe without shutting down or draining the line. Stainless bodies are available with BSPP threads.
How fast can Reotemp ship a data center order?
We build our own gauges, thermometers, thermowells and valves, so we control the schedule instead of waiting on a supplier. Standard instruments are built to order in days, and on large orders we release finished instruments in daily batches so installation is never waiting on a complete shipment.
Can you match another brand's part numbers?
Yes. Send the BOM, the spec section or a list of part numbers and we will cross each line to a Reotemp equivalent and quote it.
Working on a Data Center Project?
Send the BOM, the spec section or a list of other brands' part numbers. We will cross every line to a Reotemp equivalent and come back with pricing and a ship schedule.